Experience

Study & Design Projects

Year of award Country Project Type of Activity Parti-
cipa-
tion in the project
in %
Contract price Terms
of
Imple-
menta
tion
1985 SYRIA Marque irrigation project Preliminary Studies & Design 100 1 831 000 $ 34 months
1985   Akkar Bekka irrigation and drainage network Preliminary Studies & Design 100 22 480 SYP 51 months
1985   Snobar irrigation and drainage network Preliminary Studies & Design 100 9 806 000 $ 39 months
1986   Tigris irrigation project 150 000 ha Preliminary Studies & Design 100 17 817 946 $ 108 moths
1986   Afreen irrigation project 30 000 ha Preliminary Studies & Design 100 3 231 000 $ 40 months
1986   Khabour irrigation and drainage network Preliminary Studies & Design 100 1 754 980 $ 108 months
1995   Al Abiad dam body and hydro power plant Preliminary Studies & Design 100 350 000 $ 19 months
1999   Al Abiad irrigation system on the Al Abiad Dam Studies & Design 100 500 000 $ 28 months
2002   Irrigation and drainage project in zone No 1 of the lower Euphrates basin, 27 000 ha Studies & Design 50 2 813 000 $ 40 months
2002   Rehabilitation works of the failure Zeizoun dam, pump station and appurtenant structure Studies & Design 100 - 12 months
2002   Al Abiad dam execution Supervision and consulting 100 400 000 $ 36 months
             
1976 IRAQ High Adhaim irrigation and drainage system Preliminary Studies 100 1 775 000 $ 18 months
    Al Adhaim dam and hydro power plant Design 100   Stopped due to embargo
1980   Duhoq, Ruthba, Fosfat Shadata and Chaq-Chaq Dams Preliminary Studies 100 872 000 $ 24 months
1980   Al Wand irrigation and drainage network Design 100 217 600 $ 24 months
1983   Hydro power plant under Duhoq dam and Spillway structures of Duhoq dam Design 100 97 000 $ 12 months
1985   Drainage and irrigation system "Hilla Diwaniya 4" Preliminary Studies & Design 100 300 000 IQR  
             
1979 IRAN Ten dams in Khorosan area Preliminary Studies & Design 100 1 250 000 $ 24 months
1987   Poultry Farm for 1 000 000 birds Study, Design, Equipment delivery and erection 100 258 000 $ 36 months
1987   Fodder Plant for Combinated Fodder with 5 t/hr capacity Study, Design, Equipment delivery and erection 100 360 000 $ 12 months
             
1979 MOZAMBIQUE Three substations 66 kV with OHTLs Design 100 800 000 $ 15 months
1979   Angonia plateau 2200 ha Preliminary Studies 100 330 000 $ 12 months
1979   Chokwe irrigation system Design 100 7 524 000 $ 51 months
1982   Moamba major dam and hydro power plant Design 100 1 554 700 $ 24 months
             
1980 ALGERIA Green houses in El Kalas , Oran Preliminary Studies 100 949 000 $ 24 months
1976   Matidja General Water Economic Preliminary Studies 100 1 180 000 $ 14 months
             
1980 ZAMBIA Raffus flete, Loussaka Province Preliminary Studies & Design 100 360 000 $ 24 months
             
1980 MEXICO Stackers Winery Preliminary Studies & Design 100 115 000 $ 12 months
1979   Two Agro-Industrial Complexes Preliminary Studies & Design 100 330 000 $ 12 months
             
1981 LIBYA Poultry Complex for 5 000 000 Chickens per year ,Tripoli Design & Construction 100 11,200,000$ 1985
1981   39 Municipal Farms (poultry, cattle, dairy, etc.) Design & Construction 100 11,790,000$ 1992
1981   Garden producing 1 000 tons of apples per year - drip irrigation Design & Construction 100 2,125,000 LYD 1985
1981   Macaroni Factory Design & Construction 100 2,336,000 LYD 1993
             
1987 AFGHANISTAN Poultry Farms with 250 000 Hen Layers capacity Study, Design, Equipment delivery Erection, Assignment of Experts for operation 100 985 000 $ 36 months
1987   Poultry Farms with 500 000 Broilers per year capacity Study, Design, Equipment delivery Erection, Assignment of Experts for operation 100 1 100 000 $ 36 months
1981   Dairy Farm for 500 Milk Cows "Rishkhok" Study, Design, Equipment delivery Erection, Assignment of Experts for operation 100 830 000 $ 18 months
1991   Fodder Plant for Combined Fodder with 5 t/hr capacity Study, Design, Equipment delivery, Erection, Assignment of Experts for operation 100 920 000 $ 18 months
             
1985 ETHIOPIA Cattle Farm Koka for 500 milk cows Study, Design Equipment delivery Erection 100 641 000 $ 24 months
             
1975 NORTH KOREA Four Flour Mills with 100 t/ hr capacity each , three RC Silos 10 000 tons Study, Design Equipment delivery Erection 100 5 115 500 $ 36 months
             
1975 VIETNAM Eight Fodder Plants for Combined Fodder with 2.5 - 5 t/hr capacity each and Pig Breeding Complex for 2 500 Fattened Pigs per year Study, Design Equipment delivery Erection 100 2 536 000 $ 36 months
1975   Citronella Processing Enterprise Study, Design Equipment delivery Erection 100 250 000 12 months
             
1976 EGYPT Poultry Complex for 1 000 000 birds Design & Erection 100 5 613 000 $ 36 months
1976   Five Fodder Plants for Combined Fodder - 10 t/hr capacity each Design & Erection 100 408 000 $ 36 months
1976   Poultry Processing Plant with 1 000 birds per hour capacity Study & Design 100 1 559 000 $ 36 months